Back to news
15 May 2015 | News

Impact of Nepal Earthquake 2015 on Langthang Valley

1 min Read

70% Complete

 

The 7.8 magnitude Nepal earthquake on April 25, 2015 and subsequent aftershocks caused more than 8,500 fatalities, nearly 22,500 injured, and damaged thousands of buildings. The powerful quake also left potential secondary hazard risk from landslides and glacial lake outbursts threatening the lives and livelihood of people living the mountainous region. Langtang Valley was one of the worst hit by the earthquake, when a massive snow and ice avalanche triggered by the quake swept the entire valley leaving few survivors.

ICIMOD researchers visited Langtang Valley on 12 May and again 4-9 June to assess geo-hazards in the area and to determine the status of research stations located there. Seven out of eight meteorological stations operated by ICIMOD and its partners were found to be substantially damaged. A task force of ICIMOD researchers is working with NASA to assess landslide and river blockage in the earthquake affected area.

The task force found that in the aftermath of the earthquake, villages in the Langtang valley were destroyed by a combination of air blasts sweeping down the steep slopes of the valley, landslides, and avalanches. The avalanches made of snow and ice mixed with rock material accelerated on the way down the steep valley slopes, displacing the air to create a strong air blast. As a result the eight highest villages in the Langtang Valley — Thyangshyup, Tsarding, Chamki, Gumba, Langtang, Mundu, Singdum, and Kyangjing — were completely destroyed and buried under the avalanche debris. Early analysis of photographs and satellite imagery suggests the size of the avalanches was due in part to debris and ice accumulation above Langtang Village at 4500 meters through small ice avalanches and rock fall from Langtang-Lirung.

The Task Force continues to study and analyse the destruction in Langtang caused by the earthquake and the subsequent avalanches, landslides, and pressure waves to evaluate and map hazards in the future.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Contents

Continue exploring this topic

Anchoring Transboundary Cooperation: Vegetation and Land Use Type Map of Kailash Sacred Landscape

Kailash sacred landscape covers more than 31,000 km2 geographical area and is spread across China, India, and Nepal. It exhibits ...

25 Jun 2018 Livelihoods
Celebrating World Environment Day 2018 at The Earthquake Reconstruction And Rehabilitation Project In Dhungentar, Nuwakot

World Environment Day 2018 Event at Dhungentar: Brief Report. Since 2016, ICIMOD in partnership with the National Reconstruction Authority (NRA) has ...

Code of conduct being formalized for gender and social inclusion in the brick sector

A national consultation workshop on a social Code of Conduct (CoC) for Nepal’s brick sector was held in Kathmandu on ...

28 Sep 2016 News
Upper Indus Basin (UIB) Network Moots in Islamabad

The Technical Working Group (WG) and Strategic Committee Meetings of Upper Indus Basin (UIB) Network met 5 ...

Linking Pilot Interventions to Policy Formulation

Large cardamom is a high value cash crop and a leading source of livelihood for a large number of people ...

11 Aug 2015 News
Stakeholders discuss way forward for adaptation programme

Representatives of the promoters, partners, and stakeholders of the Himalayan Climate Change Adaptation Programme (HICAP) met in Delhi from 17-19 June 2015 ...

Reflections on the Training Workshop on GIS/RS

Bhakta Bahadur Karki, an Advisor-Knowledge Management and Communication who works with the High Value Agriculture Project (HVAP) project took part ...

Building Partner Capacity: Training on the Operation and Maintenance of Air Quality Instruments

The International Centre for Integrated Mountain Development (ICIMOD) conduced its first regional workshop on Air Quality Instrument Operation and Maintenance ...