This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
0 mins Read
In its commitment to reduce its institutional carbon foot print and promote renewable energy, ICIMOD signed a contract with Sipradi Energy of Kathmandu to expand the use of solar electrification in its buildings and office campus.
The total feasible photovoltaic (PV) power installation at the ICIMOD complex is 152.75 kWp, of which 92 kWp will be installed in first phase. The remaining solar cells will be installed once construction of the new annex building is complete, making ICIMOD fully powered by the sun.
Installation is expected to be completed in early 2016.
Share
Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.
Related Contents
Kailash Sacred Landscape Conservation and Development Initiative (KSLCDI) participated in the Fifth International Herbal Trade Fair held in Bhopal, India, ...
HIMAP Author Writeshop Held Hindu Kush Himalayas Monitoring and Assessment Program’s (HIMAP) Coordinating Lead Authors' Writeshop was organised by the ...
From 26-28 January 2016, the first writers’ workshop for the coordinating lead authors of the Hindu Kush Himalayan Monitoring and ...
The Chittagong Hill Tracts of Bangladesh hold great promise for the production and commercialization of non-timber forest products such as ...
The statistics about the damages of the 2017 floods are endless and compelling. The images of the flooding even ...
On 19–21 May 2015, the Government of Myanmar launched its ambitious Ecotourism Policy and Management Strategy for Protected Areas, developed ...