Advanced Search

AND Search
OR Search
Phrase Search
Show results per page
Search
Displaying results 1 - 12 of 12 matches (0.05 seconds)
A review and planning meeting was held in Islamabad on 7 June, 2016 on two projects underway in the Upper Indus Basin (UIB),

Sustainable land management using controlled gullying in

Gully plugging using check dams

In the early hours of 2 August 2014, a landslide occurred above Jure village, about 1.4 km upstream from the Sun Koshi Hydropower project’s intake site. In an instant, a 1.9 km long slope of land perched 1,350 m above the river bed collapsed,

Adaptation

Improved cattleshed for urine collection

Better quality farmyard manure through improved decomposition

Improved cattleshed for urine collection

Improved farmyard manure through sunlight, rain and runoff protection

ICT for Mountain Development Award 2014

Good practices

built across a gully or a channel to prevent them from deepening further. These small dams reduce the speed of water flow and minimise the erosive power of runoff. They also promote the deposition of eroded materials

  • 1