Deprecated: mysql_pconnect(): The mysql extension is deprecated and will be removed in the future: use mysqli or PDO instead in /home/icimod/public_html/searchtest/sphider/settings/database.php on line 10
ICIMOD SEARCH

Advanced Search

Search
Displaying results 21 - 40 of 341 matches (0.01 seconds)
The application serves CREST model run output for Bhutan from 2002 to early 2014. The outputs include daily streamflow and soil moisture. The model has been run by University of Oklahoma and the output data provided to ICIMOD.

Workshop on Integrated Modelling in the Koshi River Basin

Integrated Model Development Workshop for the Koshi River Basin

The Indus River Basin is shared by four countries Afghanistan, China, India, and Pakistan, with the largest portions of the basin lying in Pakistan (52%) and India (33%). The main river originates at Lake Ngangla Rinco on the Tibetan Plateau in the

meteorological and hydrological stations, we conducted maintenance on precipitation stations

26. Snow
Snow


In the mountains, permafrost stabilizes rock slopes, moraines and debris-covered slopes. For instance, moraines consist of loose sediment often held together by permafrost. When permafrost thaws, slopes become more vulnerable to erosion. Debris and

Silwal presented a poster on the ‘Application of CORDEX Ensemble to Simulate Climate Change Impacts on Flow Regime in the Upper Chamkhar Catchment, Bhutan’ during a session for Current and future Hydroclimate Changes.

and likely changes in the hydrological regime may pose a risk to future hydropower development. The changing probabilities and magnitudes of extreme events can place an additional risk

The use of remote sensing (RS) and geographic information systems (GIS) in mapping and monitoring glaciers can help professionals working in the Hindu Kush Himalaya gather data more efficiently while conducting research.

ICIMOD provided the flood outlook for various locations in Nepal to the Department of Hydrology and Meteorology (DHM).

Big data. Small data. Spatial data. Socio-economic data. Time-series data. Data in the cloud. Data on the ground. No matter what data you collect or what field you work in, if you have data it will require analysis. This four-day training will

On 8 April 2016, four students in their final year of MS Research in Glaciology shared their thesis progress with cryosphere experts from ICIMOD. The students are enrolled in the MS Research in Glaciology program at Kathmandu University, which is

Twenty-one participants attended a four-day training “Introduction to Data Analysis with R” organised by the Cryosphere initiative of the International Centre for Integrated Mountain Development (ICIMOD) held at ICIMOD headquarters 12 January to

This training covers theoretical glacier mass balance monitoring which is part of the Cryosphere Monitoring Programme and is funded by the Norwegian government .

The six expedition team members carried out annual glacier mass balance measurements, measured snow density, downloaded data and maintained the hydrological station.

ICIMOD and partners carry out an expedition to Yala Glacier in the Langtang Valley, Nepal, as part of the Cryosphere Monitoring Programme, which is part of the Cryosphere Monitoring Programme and is funded by the Norwegian government .

A team from the International Centre for Integrated Mountain Development (ICIMOD) visited community based flood early warning system (CBFEWS) sites along the Ratu River in early August 2016 to check on instruments and document community experience

hydrologists, glaciologists and other experts working in related fields at ICIMOD and its partner institutes work regularly at high altitudes (between 4,000 to 6,000 meters) to collect data on glacier mass balance, snow, weather and